FAQs
Your key questions answered
Does Tamworth really need more homes?
Tamworth, like many areas across the country, faces growing demand for new homes, particularly affordable housing for local families and first-time buyers.
Ashlands will help meet this need by delivering 196 new homes, offering a mix of property sizes and types to suit a range of households, including first-time buyers, growing families and those looking to downsize.
The development will also provide 20% affordable housing, alongside new public open space, improved walking and cycling connections, and investment in local infrastructure.
Where is the access to the site?
The site has a single vehicular access off Ashby Road. We understand that there has been some concern from site neighbours about potential for vehicular access from Coltsfoot Close. Whilst we have spoken with Tamworth Borough Council about opportunities for walking and cycling connections from our site, we are not proposing any vehicular access via Coltsfoot Close as part of our proposals.
What will be done to offset the impact on wildlife?
Protecting and enhancing the natural environment has been an important consideration throughout the planning process.
The proposals incorporate new landscaping, planting and habitats designed to support local wildlife and deliver a net gain in biodiversity.
The recently submitted reserved matters application provides further details of the landscaping proposals, including how biodiversity enhancements will be incorporated throughout the development.
Why can’t you build on brownfield land instead?
Regenerating brownfield land is crucial for new housing, but meeting housing demands requires building in diverse locations. Our plans will address local housing needs on a viable site, providing open market and affordable homes with necessary infrastructure. Developing this site also helps Tamworth Borough Council show sufficient land supply for new homes.
You have mentioned open space. What could this include?
The proposals include new areas of public open space, providing opportunities for play, recreation and relaxation for both new and existing residents.
These spaces will be complemented by landscaping and improved walking and cycling connections, helping residents access the wider countryside and surrounding neighbourhoods.
Further details of the proposed open spaces and landscaping are included within the recently submitted reserved matters application.
Can local roads accommodate the additional housing that this development will deliver?
We recognise that the impact of additional homes on the local road network is an important concern for residents.
Transport and highways have been carefully considered throughout the planning process, in consultation with Staffordshire County Council as the local highways authority.
As part of the proposals, significant investment will be made in sustainable transport, including £600,000 towards active travel improvements and £445,000 towards local bus services.
The development will also provide improved pedestrian and cycle connections, helping to encourage sustainable journeys and reduce reliance on private vehicles.
How will you address the impact on local facilities like schools and healthcare?
Through a Section 106 agreement, Bloor Homes will provide significant financial contributions towards local infrastructure, including education, healthcare and public transport.
This includes approximately £2.3 million towards primary education and £791,760 towards secondary education. The primary education contribution will support schools within the Tamworth 5 planning area. The local education authority will decide how this funding is allocated, based on where additional school places are needed.
Funding will also be provided to support existing local healthcare services, helping them meet growing demand, rather than providing a new GP surgery.
How will surface water drainage be managed as part of the development?
The proposals include a sustainable drainage system (SuDS), designed to manage surface water runoff from the development.
This will include two attenuation basins and swales, which will help to collect, store and control the flow of surface water during periods of heavy rainfall.
The drainage strategy has been carefully considered as part of the planning process and will ensure that surface water is managed appropriately within the development.
How are you going to deal with the current volume of traffic on Ashby Road?
We understand residents’ concerns about existing traffic levels on Ashby Road.
Transport assessments have been undertaken as part of the planning process, considering the potential impact of the development on the surrounding road network.
Vehicular access to the development will be provided from Ashby Road, with no vehicular access proposed via Coltsfoot Close.
Alongside this, the development will contribute £600,000 towards active travel improvements and £445,000 towards local bus services, supporting more sustainable travel options for residents.
Is the site allocated?
The site is not allocated in Tamworth Borough Council’s adopted Local Plan. However, it is identified as a proposed allocation in the emerging Local Plan, which is due to be submitted for examination in December 2026.
The proposals have been developed with consideration of the Council’s wider planning policies and the need to deliver new homes in Tamworth.
Outline planning permission has already been granted for up to 200 homes on the site, establishing the principle of residential development.
Will financial contributions from the development go to Tamworth or Lichfield?
The development will provide funding towards local schools, healthcare, public transport and walking and cycling improvements.
Primary education funding will support schools within the Tamworth 5 planning area, with the local education authority deciding how it is allocated.
Healthcare funding will support existing services, while transport contributions will help improve connections between the development and Tamworth town centre.
Have you thought about the impact this development would have on Amington Hall?
The site’s relationship with Amington Hall and the Conservation Area has been very carefully considered by the heritage consultants on the project team.
The layout and landscaping proposals included within the reserved matters application, including buffer planting, will help ensure a sensitive development edge facing Amington Hall and the Conservation Area.
These measures will help ensure the development responds appropriately to its historic surroundings.
Are you doing anything to address the issue of speeding along Ashby Road?
Highway safety has been carefully considered as part of the planning process, including the assessment of vehicle speeds and traffic movements along Ashby Road.
The approved outline proposals established the principle and design of a new vehicular access from Ashby Road, informed by the relevant highways assessments and consultation with Staffordshire County Council.
The development will also provide pedestrian and cycle connections to support safer and more sustainable journeys.
What has been done to look into the gas and water supply?
Assessments were conducted in the early stages of the proposals and looked at the situation as relates to all utilities. The information that we received from these assessments has then been utilised by Bloor’s team of in-house engineers to understand capacity and help shape the proposals.
Will the development include social housing?
The proposals include a mix of affordable housing options, comprising social rent, affordable rent, shared ownership and First Homes.
The proposed mix includes one-bedroom social rented homes, helping to provide housing options for people with different needs.
The wider development would also include market homes, with several bungalows and ground-floor maisonettes proposed.
What sustainable transport links are being considered?
The development will include pedestrian and cycle links via the main access from Ashby Road, as well as connections through to the existing public right of way.
This public right of way provides connections towards Anker Valley and Tamworth town centre, as well as the wider countryside, helping residents access local facilities and green spaces on foot or by bicycle.
These improvements will help encourage walking and cycling as alternatives to car travel, while improving connectivity between the development and the surrounding area.
What improvements are proposed for local bus services?
A contribution of £445,000 will be provided towards bus services between the development and Tamworth town centre.
Two new bus stops are also proposed to improve access to public transport.
While Bloor Homes will provide the agreed funding and infrastructure, decisions about individual bus services, routes and timetables will be made by the relevant transport providers and authorities.
How will vehicles access the development?
Vehicle access to the development will be provided from Ashby Road, with a dedicated right-turn lane proposed for vehicles entering the site.
Traffic signals are not proposed at the site access.
